Text Size
Overview | Description | Applications | Operations | Results | Publications | Images
Experiment/Payload OverviewInformation Pending
Principal Investigator
Information Pending
Payload Developer Information Pending
Sponsoring Space AgencyRoscosmos
Sponsoring Organization:Information Pending
ISS Expedition Duration:August 2001 - October 2005
3, 4, 7, 8, 9, 10, 11
Previous ISS MissionsInformation Pending
Information Pending
DescriptionReception of new data on the water-salt metabolism status and hormonal control of volimia in zero-gravity conditions and during post-flight readaptation period.
Information Pending
Earth ApplicationsInformation Pending
Plasma-03 centrifuge to separate blood into plasma and serum, Plasma-03 set of accessories for sampling, Gematokrit Kit to take blood samples and separate plasma from erythrocytes defining hematocrit number, Reflotron-4 Kit capillary blood count for hemoglobin, creatinine and urea, KV-03 Container, Plasma-03 Kit for taking, processing and storage of venous blood and urine, M-Priemniki Kit to study water-salt metabolism, Cryogem-03 refrigerator to freeze blood samples.
Operational ProtocolsStudy of the dependence between renal elimination activity and its hormonal control. Study of the balance of liquid and main electrolytes.
Evaluation of mechanisms of water-electrolyte metabolism adaptation to zero-gravity conditions.
Plasma-03 kit.