Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Site Help & Preferences
Go
ABOUT NASALATEST NEWSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ Home
SPACE SHUTTLE
SPACE SHUTTLE MAIN
SHUTTLE MISSIONS
BEHIND THE SCENES
LAUNCH AND LANDING
MULTIMEDIA
NEWS AND MEDIA RESOURCES
VEHICLE STRUCTURE
 + Space Station Section
+ Astronauts
+ NASA Home > Mission Sections > Space Shuttle > Shuttle Missions > STS-120 > Media Resources
Print ThisPrint This
Email ThisEmail This

NASA NEWS

5 p.m. CDT, Nov. 2, 2007
Mission Control Center, Houston, Texas

11.02.07
STATUS REPORT: STS-120-22

STS-120 MCC Status Report #22

HOUSTON – Space shuttle Discovery and International Space Station crew members today finished preparations for Saturday’s spacewalk to repair a torn solar array. The mission’s fourth spacewalk is set to begin about 5:30 a.m.

The astronauts spent the day positioning the station’s mobile transporter and robotic arm at the end of the truss where it will serve as a base and “cherry picker” providing ample reach for the work to free a snag in a solar array panel.

As Mission Specialists Scott Parazynski and Doug Wheelock studied detailed plans for the spacewalk, other crew members assisted by insulating tools with Kapton tape to protect against any electrical currents.

Late in the crew day, the crew reviewed the procedures with Mission Control prior to going to bed. Parazynski and Wheelock will spend the night in the Quest airlock to prepare for the spacewalk focusing on the solar array repair.

As with other spacewalks during the mission, Saturday’s could begin early depending entirely on the crew’s final preparations that begin shortly after waking up at 12:38 a.m. Saturday.

The 6½ -hour spacewalk begins with Parazynski riding the robotic arm up to the damaged area of the array. He will be secured in a foot restraint on the end of the Orbiter Boom and Sensor System – the extension to the shuttle robot arm used for inspection of the orbiter’s thermal protection system.

Though this will be the first operational use of the OBSS to reach a worksite, the task was demonstrated during a spacewalk on the STS-121 mission in July 2006 to prove the boom could provide a stable environment for this type of work.

As Parazynski installs homemade stabilizers and releases the snag suspected of causing the tear in the array panel, Wheelock will assist from the base of the solar array. The distance from the station’s center is about 165 feet out on the truss and approximately 90 feet up to the damaged site.

If all goes as planned, the crew inside will then deploy the array half a bay at a time while Parazynski watches for any new complications. The spacewalk is scheduled to wrap up about noon.

The astronauts should then be able to spend Sunday preparing to leave the station with Discovery’s undocking scheduled early Monday morning. Landing is set for just after noon on Wednesday.

The next STS-120 status report will be issued Saturday morning or earlier if events warrant.

- end -


text-only version of this release

NASA press releases and other information are available automatically by sending a blank e-mail message to hqnews-subscribe@mediaservices.nasa.gov. To unsubscribe from this mailing list, send a blank e-mail message to hqnews-unsubscribe@mediaservices.nasa.gov.

Back to NASA Newsroom | Back to NASA Homepage

+ Back to Top

+ Freedom of Information Act
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Information-Dissemination Priorities and Inventories
+ USA.gov
+ ExpectMore.gov
NASA
Editor: Amiko Nevills
NASA Official: Brian Dunbar
Last Updated: November 2, 2007
+ Contact NASA
+ SiteMap