07.28.08 - In Orbiter Processing Facility 1 at NASA's Kennedy Space Center, space shuttle Atlantis' payload bay has been thoroughly cleaned.
07.23.08 - Technicians secure the American Flag in Atlantis’ payload bay during processing for the Last Mission to Hubble.
07.23.08 - A transporter holds the container with the second shipment of hardware for the Last Mission to Hubble.
07.23.08 - An overhead crane lifts off the cover of the shipping container containing the hardware for the Last Mission to Hubble
06.21.08 - The Orbital Replacement Unit carrier being loaded into its shipping container at NASA’s Goddard Space Flight Center.
06.21.08 - The Orbital Replacement Unit carrier being loaded into its shipping container at NASA’s Goddard Space Flight Center.
07.16.08 - Pre-Ship Review demonstrated the Servicing Mission 4 flight hardware successfully passed all environmental and performance tests and is ready for shipment to the launch site.
07.15.08 - The Pegasus barge carrying the external tank for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope is tied to the dock in the turn basin in the Launch Complex 39 Area of NASA's Kennedy Space Center.
07.15.08 - The external fuel tank for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope is towed to the turn basin in the Launch Complex 39 Area at NASA's Kennedy Space Center
07.15.08 - The external fuel tank for space shuttle Atlantis' STS-125 mission to NASA's Hubble Space Telescope arrives at Port Canaveral, Fla.