Follow this link to skip to the main content

NASA - National Aeronautics and Space Administration

  • NASA Home
  •     >    Missions
  •     >    Hubble
  •     >    Servicing
  •     >    SM4
  •     >    Multimedia
    • Send
    • Bookmark

Browse Archive

  • Start
  • Backward
  • 1
  • 2
  • 3
  • 4
  • 5
  • Forward
  • End
  • Engineers in Goddard's large clean room prepare the flight spare Science Instrument Control & Data Handling unit, known as SIC&DH 2, for electrical performance testing.

    › Engineers Prepare SIC&DH 2 for Electrical Performance Testing

  • Engineers in Goddard's large clean room prepare the flight spare Science Instrument Control & Data Handling unit, known as SIC&DH 2, for electrical performance testing.

    › SM4 Astronauts Practice Installing the New SIC&DH

  • Engineers in Goddard's large clean room prepare the flight spare Science Instrument Control & Data Handling unit, known as SIC&DH 2, for electrical performance testing.

    › SM4 Astronauts Practice Installing the New SIC&DH

  • The four Shuttle carries systems that will carry all of Hubble's new hardware to Orbit on the Space Shuttle Atlantis

    › The Four Shuttle Carrier Systems that will Carry all of Hubble's New Hardware into Orbit

  • Carrier showing the batteries along with the battery cooling system

    › Hubble's New Batteries Installed onto the SLIC

  • Goddard engineers install Hubble's new batteries onto the SLIC.

    › Engineers Install Hubble's New Batteries onto the SLIC

  • Batteries are receiving final checks and cleaning at KSC.

    › Goddard Engineers Prepare Hubble's New Batteries

  • EVA crewmembers and HST engineers inspect the Soft Capture Mechanism (SCM)

    › EVA Crewmembers and HST Engineers Inspect the SCM

  • EVA crewmembers and HST engineers inspect the Cosmic Origins Spectrograph

    › EVA Crewmembers and HST Engineers Inspect the COS Instrument

  • EVA crewmembers and HST engineers inspect a flight gyroscope

    › EVA Crewmembers and HST Engineers Inspect a Flight Gyroscope

  • EVA crewmembers and HST engineers inspect the Berthing and Positioning System (BAP).

    › EVA Crewmembers and HST Engineers Inspect the BAPS

  • EVA crewmembers and HST engineers practice handling the replacement low voltage power supply board

    › EVA Crewmembers and HST Engineers Practice Handling the LVPS Replacement

  • The EVA flight crew with the Hubble team in the PHSF

    › The EVA Flight Crew with the Hubble Team in the PHSF for Crew Fam 6

  • In the Vehicle Assembly Building the overhead crane lifts space shuttle Atlantis high above its transporter.

    › In the Vehicle Assembly Building, an Overhead Crane Lifts Atlantis High Above its Transporter

  • In the Vehicle Assembly Building, Atlantis is suspended vertically above the transfer aisle. The view shows the underbelly of the shuttle.

    › Suspended in the Vehicle Assembly Building, Atlantis is Ready to be Lifted into High Bay 3

  • Suspended above the transfer aisle in the Vehicle Assembly Building,  Atlantis is ready to be lifted into high bay 3

    › Suspended Above the Transfer Aisle, Atlantis is Ready to be Lifted into High Bay 3

  • In the Vehicle Assembly Building space shuttle Atlantis is lowered alongside the external fuel tank and twin solid rocket boosters in high bay 3

    › Atlantis is Lowered Toward the External Fuel Tank - Part One

  • In the Vehicle Assembly Building space shuttle Atlantis is lowered alongside the external fuel tank and twin solid rocket boosters in high bay 3

    › Atlantis is Lowered Toward the External Fuel Tank - Part Two

  • Space Shuttle Atlantis rolls to the Vehicle Assembly Building

    › Space Shuttle Atlantis is Rolled to the Vehicle Assembly Building

  • Technicians and engineers practice servicing mission procedures

    › The Space Telescope Operations Control Center (STOCC) at GSFC

  • Start
  • Backward
  • 1
  • 2
  • 3
  • 4
  • 5
  • Forward
  • End