› Engineers Prepare SIC&DH 2 for Electrical Performance Testing
› The Four Shuttle Carrier Systems that will Carry all of Hubble's New Hardware into Orbit
› EVA Crewmembers and HST Engineers Inspect the COS Instrument
› EVA Crewmembers and HST Engineers Inspect a Flight Gyroscope
› EVA Crewmembers and HST Engineers Practice Handling the LVPS Replacement
› The EVA Flight Crew with the Hubble Team in the PHSF for Crew Fam 6
› In the Vehicle Assembly Building, an Overhead Crane Lifts Atlantis High Above its Transporter
› Suspended in the Vehicle Assembly Building, Atlantis is Ready to be Lifted into High Bay 3
› Suspended Above the Transfer Aisle, Atlantis is Ready to be Lifted into High Bay 3
› Atlantis is Lowered Toward the External Fuel Tank - Part One
› Atlantis is Lowered Toward the External Fuel Tank - Part Two
› Space Shuttle Atlantis is Rolled to the Vehicle Assembly Building
› The Space Telescope Operations Control Center (STOCC) at GSFC