The launch team members assemble at their computer and communication consoles in the Mission Directors Center at Cape Canaveral Air Force Station about three to four hours before the launch.
|
Omar Baez, NASA Launch Director The launch director ensures that the countdown and launch decision processes are properly followed. |
|
|
Tom Reinarts, NASA Deputy Chief Engineer The chief engineer is responsible for advising the launch manager of the launch vehicle's engineering and analysis status for launch. |
|
|
Bruce E. Reid, Mission Manager The mission manager serves as the primary interface between the spacecraft and the launch vehicle. | |
| Bert Garrido, Chief Safety Officer The chief safety officer is responsible for spacecraft and launch vehicle overall safety, quality and assessment of the launch countdown. |
|
|
Joy Henegar-Leon, GLAST Spacecraft Mission Director The spacecraft mission director provides the overall assessment of the spacecraft and its readiness to launch. |
|
![]() |
Stephen M. Francois, NASA Advisory Manager The advisory manager provides consultation for assessing the launch process and countdown. |