Crews at NASA’s Marshall Space Flight Center prepare the adapter for testing. The orange cylinder on top of the hardware is the upper load ring. Load lines of hydraulic pressure are put into the ring, which pushes down on the adapter to ensure the hardware won’t bend or crack.
Image credit: NASA/MSFC/David Olive