Subscribe


XML  ISS Status Reports

Current ISS On-Orbit Status Report

    International Space Station (ISS) Management Center (IMC) Daily Summary Report
    Increment 36 Operations – Stage 36-3
    05/21/13 4:00 pm Central Daylight Time (CDT)
    141/21:00 Greenwich Mean Time (GMT)

    New Status:
    Fundoscope Activation, Checkout and Eye Exam:  Flight Engineer (FE)-3 Cassidy checked out the new Fundoscope hardware used in the Prospective Observational Study of Ocular Health. Following this activity,  he performed an eye exam using the fundoscope with assistance of a physician on the ground.  Ocular Health’s protocol gathers physiological data to characterize the risk of microgravity induced visual impairment intracranial pressure on crewmembers. The data collected will be shared with crew physicians to more accurately assess changes that occur in the visual, vascular, and central nervous systems upon exposure to microgravity and the resulting fluid shifts.

    ISS Emergency Drill:  CDR Vinogradov, FE-2 Misurkin, Cassidy and ground controllers worked together to practice their initial response to a simulated ammonia leak. The teams used recently approved procedures and techniques to respond to the simulated leak. 

    Russian Treadmill (БД-2) Outfitting:  Vinogradov and Misurkin removed the БД-2 from the Progress and started assembling the unit. The vibration isolation system has been unpacked and assembled.  The crew has begun to assemble the belt unit and will continue with outfitting on Wednesday.

    Vane Gap 1 (VG-1) Hardware Setup:  Cassidy configured the Capillary Flow Experiment (CFE)-2 hardware that will be used Wednesday to perform the Vane Gap 1 (VG-1) experiment. The primary objective of the Vane Gap experiment is to determine equilibrium interface configurations and critical wetting conditions for interfaces between interior corners separated by a gap.

    Today’s Planned Tasks
    · Pressurization of Elektron-VM Liquid Unit before Activation r/g 2417  [Complete]
    · Review Procedure for БД-2 Installation Ops in RS r/g 2415  [Complete] 
    · Potable Water Dispenser (PWD) Beverage Adapter Cleaning [Complete]
    · Perform БД-2  Installation Ops in RS r/g 2415  [Complete]
    · ARED Flywheel Cylinder Evacuation [Complete]
    · RGN - Initiate drain into EDV [Complete]
    · RGN - Terminate drain into EDV [Complete]
    · SSC Connection, Part 2 [Complete]
    · OBT ISS Emergency Drill.   [Complete]
    · Comm Reconfig for Nominal Ops after Emergency Drill [Complete]
    · CFE - Hardware Setup [Complete]
    · ISS Crew and MCC-M OBT Debrief  [Complete]
    · Tightening Quick-disconnect screw clamps on MRM1- СтА FGB  [Complete]
    · СОЖ Maintenance  [Complete]
    · Ocular Health (OH) Fundoscope Setup [Complete]
    · Ocular Health (OH) - Fundoscope Prep [Aborted]
    · Ocular Health (OH) - Fundoscope Exam [Complete]
    · Ocular Health (OH) - Fundoscope Stow [Complete]

    Task List
    · ECON-M. Observations and Photography
    · IMS Update
    · URAGAN Observations and Photography / r/g 2398
    · Preparation of reports for Roskosmos site / r/g 0484
    · RSS2 Downlink via РСПИ / r/g 2003
    · HRF1 Rack Audit
    · WHC KTO replace
    · ARED Slide Tether [Complete]
    · Laptop Cleanup Part 5  [Complete] 
    · N2 Spare Tools Audit
    · D3S Sensor Clean
    · Trash D2XS Camera
    · IMV Flow Measure
    · CEO Ops  [Complete]
    · WSTA Fill

    Ground
    · Nominal Commanding

    Three-Day Look Ahead:
    Wednesday, May 22: BD-2 Install, CFE VG1 Test, Lab video encoder test
    Thursday, May 23: BD-2 Install, SPHERES
    Friday, May 24:
    Seedling Growth Sample Process,  EXPRESS 3 Laptop Software Load

    Meeting Schedule:
    Meeting
    Day
    Date
    Houston Time (CDT)
    IMMT
    Thursday
    May 23
    8:00 a.m.
    IMMT
    Monday
    May 27
    CANCELLED
    IMMT
    Thursday
    May 30
    8:00 a.m.