Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Site Help & Preferences
Go
ABOUT NASALATEST NEWSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ NASA Home
+ KSC Home
Kennedy Space Center
CENTER HOME
ABOUT KENNEDY
KENNEDY NEWS
KENNEDY MULTIMEDIA
MISSIONS
KENNEDY EVENTS
EDUCATION
DOING BUSINESS WITH US
SHUTTLE OPERATIONS
LAUNCHING ROCKETS
STATION PAYLOADS
Go
+ NASA Home > Centers > Kennedy Space Center > Shuttle Operations > Shuttle Status Reports > 2006
Print ThisPrint This
Email ThisEmail This

NASA NEWS

Katherine Trinidad
Headquarters, Washington
(202) 358-3749

Jessica Rye
Kennedy Space Center, Fla.
(321) 867-2468


05.12.06
STATUS REPORT: S-051206

NASA's Space Shuttle Processing Status Report

NASA's space shuttle fleet is housed and processed at Kennedy Space Center, Fla.

Mission: STS-121 - 18th International Space Station Flight (ULF1.1) - Multi-Purpose Logistics Module
Vehicle: Discovery (OV-103)
Location: Vehicle Assembly Building
Launch Date: Launch Processing Window July 1-19, 2006
Launch Pad: 39B
Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Discovery was moved today from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building, a major step toward a launch to the International Space Station. Technicians and crane operators began preparations to lift Discovery into the assembly building's High Bay 3 and attach the shuttle to its external fuel tank and twin solid rocket boosters. After final integration, a crawler transporter is scheduled to carry Discovery to the launch pad May 19.

Discovery was scheduled to move Thursday, but a sheared left-hand jack screw on the lifting sling in the assembly building postponed the rollover until today. Both the right and left-hand screws were removed and replaced. The replacements were inspected, analyzed, proof loaded and installed on the sling.

The payloads that will launch aboard Discovery were loaded into the payload transportation canister this week and are scheduled to roll out to the launch pad on May 16. Discovery's payloads include the Italian-built logistics module, known as Leonardo, which will carry food, clothing, spare parts and research equipment to the station. Other payloads include two cargo carriers which contain heat shield tile samples, a spare pump module and a replacement mobile transporter reel assembly.

For previous space shuttle processing status reports, visit:

http://www.nasa.gov/shuttle


- end -


text-only version of this release

To receive status reports and news releases issued from the Kennedy Space Center Newsroom electronically, send a blank e-mail message to ksc-subscribe@newsletters.nasa.gov. To unsubscribe, send a blank e-mail message to ksc-unsubscribe@newsletters.nasa.gov. The system will confirm your request via e-mail.

+ Back to Top
FirstGov - Your First Click to the US Government

ExpectMore.gov

+ Freedom of Information Act
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Information-Dissemination Priorities and Inventories
NASA
Editor: Jeanne Ryba
NASA Official: Brian Dunbar
Last Updated: January 5, 2007
+ Contact Kennedy
+ SiteMap