STATUS REPORT : S-19970702
 
 
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
 
 
412:33 PM EDT
FLIGHT DAY 2

KSC Public Affairs Contact: Joel Wells (fax 407-867-2692)

MISSION: STS-94 -- Microgravity Science Laboratory-1

VEHICLE: Columbia/OV-102
LOCATION: on orbit
OFFICIAL LAUNCH DATE/TIME: July 1 at 2:02 p.m. EDT
LAUNCH WINDOW: 2 hours, 30 minutes
TARGET KSC LANDING DATE/TIME: July 17 at about 6:38 a.m. EDT
MISSION DURATION: 15 days, 16 hours, 36 minutes
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/28.45 degrees
NOTE: Postlaunch inspections of pad 39A revealed only minor damage.

The solid rocket booster retrieval ships began recovery operations yesterday afternoon and are expected to return to Hangar AF with boosters in tow at 1:30 and 2:30 p.m. Initial inspections are scheduled to begin July 7.

The crew of Mission STS-94: Commander Jim Halsell; Pilot Susan Still; Mission Specialists Janice Voss, Michael Gernhardt and Donald Thomas; and Payload Specialists Roger Crouch and Greg Linteris.

MISSION: STS-85 -- CRISTA-SPAS-2

VEHICLE: Discovery/OV-103
LOCATION: Orbiter Processing Facility bay 2
TARGET KSC LAUNCH DATE/TIME: August 7 at 10:39 a.m.
LAUNCH WINDOW: 1 hour, 41 minutes
TARGET KSC LANDING DATE/TIME: August 18 at 7:27 a.m.
MISSION DURATION: 10 days, 20 hours, 48 minutes
CREW: Brown, Rominger, Davis, Curbeam, Robinson, Tryggvason
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/57 degrees
NOTE: Preparations are underway to roll Discovery to the Vehicle Assembly Building on Monday. Weight and center of gravity tests are complete and final inspections are in work. In the VAB, orbiter/external tank mating preparations are also in work.

STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

Orbiter roll to VAB for mate to ET/SRB stack (July 7)
Crista-Spas payload to pad 39A (July 10)
Orbiter roll out to pad 39A (July 14)
Terminal Countdown Demonstration Test (July 22-23)

MISSION: STS-86 -- 7th MIR DOCKING & SPACEHAB DM

VEHICLE: Atlantis/OV-104
LOCATION: Orbiter Processing Facility bay 3
TARGET KSC LAUNCH DATE/TIME: September 18 at about 1:39 a.m.
LAUNCH WINDOW: 7-10 minutes
TARGET KSC LANDING DATE/TIME: September 28 at about 5:19 a.m.
MISSION DURATION: 10 days, 3 hours, 49 minutes
CREW: Wetherbee, Bloomfield, Parazynski, Titov, Chretien, Lawrence (up), Foale (down)
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees
NOTE: Preparations are in work for main engine installation tomorrow. Ammonia servicing preparations are also in work. Water spray boiler servicing will conclude tomorrow and functional testing of Atlantis' external tank umbilical doors will begin tomorrow. Stronger replacement bolts were installed in the doors' linkage system after previous bolts were bent during door cycling activities.

In the VAB, solid rocket booster stacking operations are underway.

STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

Space Shuttle main engine installation complete (July 7)
Crew Equipment Interface Test (July 26)

MISSION: STS-89 -- 8th MIR DOCKING & SPACEHAB DM
VEHICLE: Endeavour/OV-105
LOCATION: Orbiter Processing Facility bay 1
TARGET KSC LAUNCH DATE/TIME: January 15, 1998 at about 12:57 a.m.
LAUNCH WINDOW: 7-10 minutes
TARGET KSC LANDING DATE/TIME: January 24, 1998 at about 5:20 a.m.
MISSION DURATION: 9 days, 4 hours, 23 minutes
CREW: Wilcutt, Edwards, Dunbar, Anderson, Reilly, Wolf (up), Lawrence (down)
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees
NOTE: Servicing of Endeavour's freon coolant loop No. 2 continues through Thursday and radiator functional tests begin today. Tests on the main propulsion system and atmospheric revitalization control system are in work. Weight-saving modifications on the left and right-hand elevon coves, where the back of the orbiter's wings meet the elevons, are in work through next week.

 

- end -


text-only version of this release

To receive status reports and news releases issued from the Kennedy Space Center Newsroom electronically, send a blank e-mail message to ksc-subscribe@newsletters.nasa.gov. To unsubscribe, send a blank e-mail message to ksc-unsubscribe@newsletters.nasa.gov. The system will confirm your request via e-mail.