June 4, 1997
 
STATUS REPORT : S-19970604
 
 
KENNEDY SPACE CENTER SPACE SHUTTLE STATUS REPORT
 
 
2:39 PM EDT

KSC Public Affairs Contact: Joel Wells (fax 407-867-2692)

MISSION: STS-94 -- Microgravity Science Laboratory-1

VEHICLE: Columbia/OV-102
LOCATION: Vehicle Assembly Building
TARGET KSC LAUNCH DATE/TIME: July 1 at 2:37 p.m.
LAUNCH WINDOW: 2 hours, 30 minutes
TARGET KSC LANDING DATE/TIME: July 17 at 7:23 a.m.
MISSION DURATION: 15 days, 16 hours, 46 minutes
CREW: Halsell, Still, Voss, Gernhardt, Thomas, Crouch and Linteris
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/28.45 degrees
NOTE: The Space Shuttle Columbia rolled into the Vehicle Assembly Building today at about 11:20 a.m., on its way to be mated to the external fuel tank and solid rocket boosters. In the VAB, wiring work will continue in the Shuttle's avionics bay 4 and electrical check-outs of an auxiliary power unit will pick-up.

STS-94 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

Orbiter hard mated to ET/SRBs (June 5)
Shuttle interface test (June 9-10)
Roll out to pad 39A (June 11)

MISSION: STS-85 -- CRISTA-SPAS-2

VEHICLE: Discovery/OV-103
LOCATION: Orbiter Processing Facility bay 2
TARGET KSC LAUNCH DATE/TIME: August 7 at 10:39 a.m.
LAUNCH WINDOW: 1 hour, 41 minutes
TARGET KSC LANDING DATE/TIME: August 18 at 7:27 a.m.
MISSION DURATION: 10 days, 20 hours, 48 minutes
CREW: Brown, Rominger, Davis, Curbeam, Robinson, Tryggvason
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/57 degrees
NOTE: Leak checks in Discovery's aft engine compartment are in work. Heat shield installation will begin next week and mid-body close-outs continue on schedule. Inspections of the thermal protective tiles on the orbiter's forward reaction control system will pickup this week. Solid rocket booster stacking operations continue in the VAB.

STS-85 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

Heat shield installation (June 6)
Crew equipment and interface test (June 14)

MISSION: STS-86 -- 7th MIR DOCKING & SPACEHAB DM

VEHICLE: Atlantis/OV-104
LOCATION: Orbiter Processing Facility bay 3
TARGET KSC LAUNCH DATE/TIME: September 18 at about 1:39 a.m.
LAUNCH WINDOW: 10 minutes
TARGET KSC LANDING DATE/TIME: September 28 at 5:19 a.m.
MISSION DURATION: 10 days, 3 hours, 49 minutes
CREW: Wetherbee, Bloomfield, Parazynski, Titov, Chretien, Lawrence (up), Foale (down)
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees
NOTE: Preparations are underway for main engine removal, currently scheduled for tomorrow. Atlantis' forward reaction control system will undergo functional tests today.

STS-86 SCHEDULED OPERATIONAL MILESTONES (dates are target only):

Remove main engines (June 5)

MISSION: STS-89 -- 8th MIR DOCKING & SPACEHAB DM
VEHICLE: Endeavour/OV-105
LOCATION: Vehicle Assembly Building bay No. 2
TARGET KSC LAUNCH DATE/TIME: January 15, 1998 at about 12:57 a.m.
LAUNCH WINDOW: 7 - 10 minutes
TARGET KSC LANDING DATE/TIME: January 24, 1998 at about 5:20 a.m.
MISSION DURATION: 9 days, 4 hours, 23 minutes
CREW: Wilcutt, Edwards, Dunbar, Anderson, Reilly, Wolf (up), Lawrence (down)
ORBITAL ALTITUDE and INCLINATION: 160 nautical miles/51.6 degrees
NOTE: Preparations are in work to move Endeavour from the VAB to OPF bay 1 tonight at about 6 p.m., weather permitting. Once there, processing will begin for Endeavour's next mission, STS-89.

 

- end -


text-only version of this release

To receive status reports and news releases issued from the Kennedy Space Center Newsroom electronically, send a blank e-mail message to ksc-subscribe@newsletters.nasa.gov. To unsubscribe, send a blank e-mail message to ksc-unsubscribe@newsletters.nasa.gov. The system will confirm your request via e-mail.