VEHICLE ASSEMBLY BUILDING BACK IN BUSINESS Jessica Rye October 8, 2004 Kennedy Space Center, Fla. (Phone: 321/867-2468) KSC Release No. P16-04 Vehicle Assembly Building Back in Business Inside the KSC Engine Shop, Boeing-Rocketdyne technicians remove the container that enclosed the third and final Space Shuttle Main Engine (SSME) for Discovery's Return to Flight mission STS-114. The VAB lost 820 panels from the south wall during Hurricane Frances, and 25 additional panels pulled off the east wall by Hurricane Jeanne. Employees of Met-Con, a subcontractor in Cocoa, Fla., worked night and day on scaffolds hung from the 525-foot-high roof to close the holes and enable the facility to return to normal operations. KSC Photo Number: KSC-04PD-2092 A complete gallery of NASA Kennedy Space Center photos are available at: http://mediaarchive.ksc.nasa.gov/index.cfm -end-