Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Site Help & Preferences
Go
ABOUT NASALATEST NEWSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ NASA Home
+ JSC Home
Johnson Space Center
CENTER HOME
ABOUT JOHNSON
JOHNSON NEWS
MULTIMEDIA
MISSIONS
JOHNSON EVENTS
EDUCATION
DOING BUSINESS WITH US
SPACE STATION
SPACE SHUTTLE
EXPLORATION
ASTRONAUTS
Go
+ NASA Home > Centers > Johnson Home > Johnson News > Station Status > 2004
Print ThisPrint This
Email ThisEmail This

JOHNSON NEWS

10 a.m. CDT, Tuesday, June 29, 2004
Expedition 9 Crew
06.29.04
STATUS REPORT: ISS04-35

International Space Station Status Report #04-35

Mission managers today gave a green light to proceed on Wednesday with a second spacewalk to attempt to repair a circuit breaker on the International Space Station. The repair is planned to restore power to one of four gyroscopes that help orient the complex.

The Expedition 9 crew’s first spacewalk was cut short Thursday when flight controllers in Moscow noticed almost immediately an unexpectedly high rate of pressure loss in the primary oxygen bottle on Astronaut Mike Fincke’s Russian spacesuit.

Based on analysis, testing and on-orbit troubleshooting, managers concluded that the excessive oxygen pressure drop was caused by an open oxygen flow switch on Fincke’s suit. The switch was not fully seated into the normal flow position before the spacewalk started, causing an unexpectedly swift flow of oxygen from the primary oxygen bottle into Fincke’s spacesuit. Russian technicians concluded that it was an isolated event and gave the crew approval to use the same suits for tomorrow’s rescheduled spacewalk. The spacewalk procedures have been updated to provide additional crew verification steps to ensure the handle is properly positioned.

The objective of the spacewalk is to restore power to Control Moment Gyroscope (CMG) 2 by replacing a Remote Power Controller Module (RPCM). CMG 2 was taken off line April 21 by the failure of a circuit breaker in the RPCM. Because of the failure of CMG 1 about two years ago, the attitude of the Station is being adequately controlled by the two remaining CMGs.

Coverage and commentary of the spacewalk will begin Wednesday at 3:30 p.m. CDT. The spacewalk is scheduled to begin at 4:40 p.m. The excursion is expected to last up to six hours.

Because the spacewalk will be occurring simultaneously with the arrival of the Cassini-Huygens spacecraft at Saturn, coverage of the spacewalk will be broadcast on AMC-9, Transponder 5, C-band, 85 degrees west longitude, vertical polarization, 3800 MHz with audio at 6.8 MHz. Cassini’s mission will be seen on NASA Television’s regular satellite channel, AMC-9, Transponder 9, 85 degrees west longitude, vertical polarization, 3880 MHz with audio at 6.8 MHz.

Both the spacewalk and Cassini programs will be broadcast live on the Internet at:

http://www.nasa.gov/ntv

Information on the crew's activities aboard the Space Station, future launch dates, as well as Station sighting opportunities from anywhere on the Earth, is available on the Internet at:

http://spaceflight.nasa.gov/

Details on Station science operations can be found on an Internet site administered by the Payload Operations Center at NASA's Marshall Space Flight Center in Huntsville, Ala., at:

http://scipoc.msfc.nasa.gov/

The next ISS status report will be issued Wednesday night following the spacewalk.



- end -


text-only version of this release

+ Back to Top
FirstGov - Your First Click to the US Government

ExpectMore.gov

+ Freedom of Information Act
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Information-Dissemination Priorities and Inventories
NASA
Editor: John Ira Petty
NASA Official: Brian Dunbar
Last Updated: November 21, 2006
+ Contact Johnson
+ SiteMap