Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Site Help & Preferences
Go
ABOUT NASALATEST NEWSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ NASA Home
+ JSC Home
Johnson Space Center
CENTER HOME
ABOUT JOHNSON
JOHNSON NEWS
MULTIMEDIA
MISSIONS
JOHNSON EVENTS
EDUCATION
DOING BUSINESS WITH US
SPACE STATION
SPACE SHUTTLE
EXPLORATION
ASTRONAUTS
Go
+ NASA Home > Centers > Johnson Home > Johnson News > Station Status > 1998
Print ThisPrint This
Email ThisEmail This

JOHNSON NEWS

12 noon CST, Monday, November 30, 1998
Mission Control Center, Houston, Texas

11.30.98
STATUS REPORT: ISS98-09

International Space Station Status Report #98-9

Flight controllers in Moscow and Houston continued to monitor systems on the Zarya module during the weekend and prepare for the arrival of the Space Shuttle Endeavour and the Unity connecting node.

Zarya remains in excellent condition overall with only a few minor mechanical issues under analysis that are not expected to pose any problems for the planned operations of the International Space Station. For one of the problems -- a potential glitch with the energy storage and discharging capability of one of six batteries housed in the Zarya module - flight controllers are planning to carry replacement parts aboard Endeavour that could be installed by the shuttle crew. The battery is still usable with the glitch, and even without any repairs performed, the problem would not be expected to have an impact on Endeavour's mission or following station operations, although it would decrease the amount of backup energy and battery systems available.

Station mission managers have decided to load two small replacement electronics boxes for the battery system, a current converter unit and a storage battery current regulator unit (referred to by the Russian acronym PTAB), aboard Endeavour along with associated cabling. A decision on whether the crew will be asked to install any of the equipment during the flight has not been made.

Tests of the battery system during the weekend have led Russian flight controllers to suspect the problem may most likely be within the storage battery current regulator unit (PTAB). Endeavour Mission Specialist Sergei Krikalev, a Russian cosmonaut, has performed a similar repair on equipment aboard the Mir Space Station.

Flight controllers also plan to request that Endeavour's crew use television cameras to view the antennas on Zarya associated with the Telerobotically Operated, or TORU, manual docking system. Recent signal-strength testing has indicated these antenna may be fully deployed, although the deployment cannot be confirmed from other data. The crew will inspect the antennas during a standard television survey of Unity and Zarya planned on Day 4 of Endeavour's flight. Mission Specialists Jerry Ross and Jim Newman are planned to traverse near the area of one of the TORU antennas during the third spacewalk planned for STS-88, as they move to the far end of Zarya to install a handrail. No spacewalking activities involving the antenna are planned, however.

The TORU system is a manually operated docking system that serves as a backup for the Kurs automated docking system, which is the primary docking system to be used for the arrival of the Service Module in summer 1999.

During times when Zarya is not actively performing systems checks or other operations, it is put into a slow spin to conserve fuel and maintain moderate temperatures on the spacecraft.

Zarya is circling Earth once every 92 minutes in an orbit of 250 by 240 statute miles.

The next ISS status report is planned for Wednesday, Dec. 2, or as developments warrant.

Note: For further information, please contact the NASA Public Affairs Office at the Russian Mission Control Center, Korolev, Russia, 256-961-6225 or the NASA Public Affairs Office at the Johnson Space Center, Houston, Texas, 281-483-5111.

- end -


text-only version of this release

+ Back to Top
FirstGov - Your First Click to the US Government

ExpectMore.gov

+ Freedom of Information Act
+ Budgets, Strategic Plans and Accountability Reports
+ The President's Management Agenda
+ Privacy Policy and Important Notices
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Information-Dissemination Priorities and Inventories
NASA
Editor: John Ira Petty
NASA Official: Brian Dunbar
Last Updated: November 21, 2006
+ Contact Johnson
+ SiteMap