Follow this link to go to the text only version of nasa.gov
NASA -National Aeronautics and Space Administration
Follow this link to skip to the main content
+ Text Only Site
+ Contact Johnson
Go
ABOUT NASANEWS AND EVENTSMULTIMEDIAMISSIONSMyNASAWORK FOR NASA

+ NASA Home
+ Center Home
Johnson Space Center
CENTER HOME
ABOUT JOHNSON
JOHNSON NEWS
MULTIMEDIA
MISSIONS
JOHNSON EVENTS
EDUCATION
DOING BUSINESS WITH US
SPACE STATION
SPACE SHUTTLE
EXPLORATION
ASTRONAUTS
Go

JOHNSON NEWS

Tuesday, December 21, 1999, 11 p.m. CST
12.21.99
STATUS REPORT: STS-103-05

STS-103 Mission Control Center Status Report # 5

After a 30-orbit chase, Discovery astronauts completed a successful rendezvous Tuesday evening with the Hubble Space Telescope, grappling it with the robotic arm and latching it into the orbiter’s cargo bay.

Controllers at Goddard Space Flight Center had placed the space telescope in an attitude with its closed aperture pointed toward Earth. Commander Curt Brown guided Discovery through an approach from below and fly-around. Then, Mission Specialist Jean-Francois Clervoy reached out with the shuttle's robotic arm to grip a grapple fixture on Hubble. The grapple was made at 6:34 p.m. Central time, one day, 23 hours and 44 minutes after Discovery’s launch from the Kennedy Space Center in Florida.

Clervoy used the arm to rotate the space telescope and bring its base into the cargo bay. Hubble, gleaming silver in its Mylar insulation flanked by golden-colored solar arrays, was firmly attached to the Flight Support System in Discovery’s cargo by a little after 7:30 p.m. Hubble is as tall as a four-story building. With a maximum diameter of 14 feet, it is about the size of a railroad tank car.

The Flight Support System is a U-shaped device with a circular platform between the U’s arms now supporting the space telescope. The system provides power from Discovery to the telescope and can rotate and tilt it to facilitate access to its various compartments by space-walking astronauts. An initial, carefully choreographed survey using a camera at the end of the robotic arm was made. Camera surveys of Hubble’s condition will continue during the crew’s sleep period, scheduled to begin about 12:50 a.m. Wednesday.

The first of three planned space walks to repair and upgrade Hubble equipment is scheduled to begin at 1:40 p.m. Wednesday, though astronauts may get an early start. If they can get ahead of schedule, they may be able to perform some tasks that had been scheduled for the cancelled fourth spacewalk.

On Wednesday, Mission Specialist and Payload Commander Steve Smith and Mission Specialist John Grunsfeld will first replace the telescope’s three Rate Sensor Units. Each contains two gyroscopes. The second major task is installation of six Voltage/Temperature Improvement Kits between Hubble’s solar panels and its six 10-year-old batteries. The cell telephone-sized kits are designed to prevent any overheating or overcharging of those batteries.

Discovery’s systems continue to function well as the astronauts wind up final preparations for Wednesday’s space walks and prepare for sleep. The spacecraft was in an orbit with a high point of 380 statute miles and a low point of 355 miles.

The next Mission Control Center status report will be issued at 11 a.m. Wednesday or as events warrant.



- end -


text-only version of this release



FirstGov - Your First Click to the US Government
+ Inspector General Hotline
+ Equal Employment Opportunity Data Posted Pursuant to the No Fear Act
+ Budgets, Strategic Plans and Accountability Reports
+ Freedom of Information Act
+ The President's Management Agenda
+ NASA Privacy Statement, Disclaimer,
and Accessibility Certification

NASA
Editor: John Ira Petty
NASA Official: Brian Dunbar
Last Updated: April 26, 2005
+ Contact Johnson