|
1978-1980 News Releases + 1976 + 1979 + 1980 + 1978 News Releases (3.5 Mb PDF file) |
|
| Date | Title |
| Jan. 6, 1978 | 78-001 -- NASA AWARDS SHUTTLE RADIO CONTRACT TO RCA |
| Jan. 6, 1978 | 78-002 -- ORBITER CONTRACT SUPPLEMENT COVERS 10 CONTRACT CHANGES |
| Jan. 16, 1978 | 78-003 -- NASA SELECTS 35 ASTRONAUT CANDIDATES |
| Jan. 20, 1978 | 78-005 -- NASA ADDS SPARE PARTS TO ORBITER CONTRACT |
| Feb. 1, 1978 | 78-004 -- SINGER COMPANY TO BUILD SPACELAB SIMULATOR |
| Feb. 3, 1978 | 78-006 -- DATA ON THE ORBIT OF SKYLAB |
| Feb. 6, 1978 | 78-007 -- NASA SIGNS CONTRACT WITH LOCKHEED FOR WHITE SANDS SUPPORT |
| Feb. 10, 1978 | 78-008 -- JSC TO PROCESS PRISTINE METEORITE FRAGMENTS |
| Feb. 16, 1978 | 78-009 -- NASA SIGNS ADD-ON TO FORD CONTRACT |
| Feb. 22, 1978 | 78-010 -- NORTHROP SIGNED TO OPERATE JSC LABS |
| Feb. 23, 1978 | 78-011 -- ENTERPRISE AT ELLINGTON |
| Feb. 23, 1978 | 78-012 -- SLAYTON APPOINTMENT |
| March 1, 1978 | 78-013 -- SKYLAB ACTIVATION |
| March 8, 1978 | 78-014 -- LUNAR AND PLANETARY DISCOVERIES TO BE PRESENTED AT HOUSTON SESSIONS |
| March 16, 1978 | 78-015 -- NASA NAMES ASTRONAUT CREWS FOR EARLY SHUTTLE FLIGHTS |
| March 17, 1978 | 78-016 -- SHUTTLE FLIGHT DIRECTORS NAMED BY NASA |
| March 30, 1978 | 78-017 -- IBM GETS CONTRACT ADD-ON FOR HOUSTON DATA WORK |
| May 10, 1978 | 78-018 -- IBM CONTRACT EXTENDED |
| May 17, 1978 | 78-019 -- SPACE BIOSCIENCE CONFERENCE HELD BY UT, NASA-JSC |
| May 18, 1978 | 78-020 -- NASA PLANS SKYLAB ATTITUDE CHANGE PROCEDURES |
| May 19, 1978 | 78-021 -- NASA ADJUSTS ROCKWELL ORBITER CONTRACT COSTS |
| May 30, 1978 | 78-022 -- JSC NEGOTIATES WITH A-V CORPORATION FOR AUDIOVISUAL PUBLIC INFORMATION SUPPORT SERVICES |
| May 31, 1978 | 78-023 -- FOURTH ANNUAL AEROSPACE WORKSHOP SET FOR JUNE 5 |
| May 31, 1978 | 78-024 -- SPACE CENTER TO BEGIN PROCESSING OF RARE METEORITES |
| June 19, 1978 | 78-025 -- NOTE TO EDITORS: SKYLAB ACTIVITIES |
| June 22, 1978 | 78-026 -- METEORITE FRAGMENT CONFIRMED AS RARE TYPE |
| June 29, 1978 | 78-027 -- NEW ASTRONAUT CANDIDATES ARRIVE AT JSC FOR TRAINING |
| June 30, 1978 | 78-029 -- COMPUTER SCIENCES GETS JSC COMPUTER SYSTEMS CONTRACT |
| July 3, 1978 | 78-028 -- MAC-DAC PACT EXTENDED |
| July 17, 1978 | 78-030 -- IBM CONTRACT ADD-ON COVERS SHUTTLE AVIONICS SOFTWARE |
| July 17, 1978 | 78-031 -- SPACE WEEK PROCLAIMED |
| July 24, 1978 | 78-032 -- ASTRONAUT CANDIDATES LEARN WATER SURVIVAL TECHNIQUES |
| July 26, 1978 | 78-033 -- JOE ALLEN RETURNS TO JOHNSON SPACE CENTER ASTRONAUT OFFICE |
| Aug. 1, 1978 | 78-034 -- MISSION SPECIALISTS FOR SPACELAB 1 NAMED AT JSC |
| Aug. 9, 1978 | 78-035 -- NASA, USGS PUBLISH FAULT MAP OF SE GREATER HOUSTON AREA |
| Aug. 9, 1978 | 78-036 -- SYMPOSIUM TO DISCUSS RESULTS OF MAJOR CROP MONITORING EQUIPMENT |
| Aug. 15, 1978 | 78-037 -- FORMER NASA ASTRONAUTS TO ATTEND BRIEFINGS AT JOHNSON SPACE CENTER |
| Aug. 18, 1978 | 78-038 -- JSC TO ASK THINK TANK TO STUDY FUTURE CENTER ROLE |
| Aug. 23, 1978 | 78-039 -- ASTRONAUT CANDIDATES TO TAKE PARASAIL TRAINING AT VANCE AFB, Aug. 28 |
| Sept. 7, 1978 | 78-040 -- SHUTTLE MANEUVER ENGINE TESTED AT WHITE SANDS |
| Sept. 8, 1978 | 78-041 -- NASA AMENDS FORD CONTRACT |
| Sept. 19, 1978 | 78-042 -- ITEK TO BUILD ORBITER CAMERA SYSTEM |
| Sept. 22, 1978 | 78-043 -- JSC SELECTS GENERAL ELECTRIC COMPANY FOR SHUTTLE FOOD GALLEY |
| Sept. 25, 1978 | 78-044 -- NOTE TO EDITORS: SPACE SHUTTLE STATUS |
| Sept. 29, 1978 | 78-045 -- TEXAS TO BENEFIT FROM SPACE-AGE REMOTE SENSING TECHNIQUES |
| Oct. 11, 1978 | 78-046 -- OMB OFFICIAL TO ADDRESS SYMPOSIUM |
| Oct. 17, 1978 | 78-047 -- NASA AMENDS ROCKWELL ORBITER CONTRACT |
| Oct. 19, 1978 | 78-048 -- GE GETS ORBITER CHECKOUT CONTRACT |
| Oct. 30, 1978 | 78-049 -- SEASAT SCIENTIST TO TALK ABOUT HURRICANE MEASUREMENTS |
| Oct. 31, 1978 | 78-050 -- SKYLAB ORBITAL ATTITUDE TO BE REVERSED |
| Oct. 31, 1978 | 78-051 -- NASA JOHNSON SPACE CENTER AMENDS FORD AEROSPACE MISSION CONTROL CONTRACT |
| Nov. 17, 1978 | 78-052 -- GLOBAL CROP EXPERIMENT EVALUATED |
| Dec. 1, 1978 | 78-054 -- JSC SIGNS IBM SUPPLEMENT |
| Dec. 1, 1978 | 78-055 -- JSC EXTENDS ALPHA CONTRACT |
| Dec. 4, 1978 | 78-053 -- NASA EXCEPTIONAL SERVICE AWARDS |
| Dec. 8, 1978 | 78-056 -- JSC AWARDS SUPPORT CONTRACT TO LOCKHEED |
| Dec. 12, 1978 | 78-057 -- JSC NEGOTIATES WITH OMEGA SERVICES FOR CENTER CUSTODIAL SUPPORT CONTRACT |
| Dec. 15, 1978 | 78-060 -- JSC EXTENDS LINK SIMULATOR CONTRACT |
| Dec. 18, 1978 | 78-058 -- SUPER GUPPY TO DELIVER SHUTTLE TRAINING EQUIPMENT TO JSC |
| Dec. 18, 1978 | 78-059 -- JSC NEGOTIATES WITH MCKINSEY FOR STUDY CONTRACT |
| + 1979 News Releases (2.7 Mb PDF file) | |
| Date | Title |
| Jan. 15, 1979 | 79-001 -- INVENTION BY HOYT MCBRYAR HELPS EXTEND LIFE OF SPACE SHUTTLE FUEL CELLS |
| Jan. 23, 1979 | 79-002 -- NASA TO PRESENT THE AEROSPACE EDUCATION PROJECT SERVICES |
| Feb. 1, 1979 | 79-003 -- SKYLAB FLIGHT CONTROL ACTIVITIES TO BE REDUCED |
| Feb. 2, 1979 | 79-004 -- CHINESE VICE PREMIER VISITS JSC |
| Jan. 29, 1979 | 79-005 -- NASA EXTENDS LOCKHEED WHITE SAND CONTRACT |
| Feb. 1, 1979 | 79-006 -- SHUTTLE ORBITERS NAMED AFTER SEA VESSELS |
| Feb. 5, 1979 | 79-007 -- SPACE SHUTTLE ORBITER PROCUREMENT CONTRACT SIGNED |
| Feb. 18, 1979 | 79-008 -- ANTARCTIC METEORITE EXPEDITION SUCCESSFUL AGAIN |
| Feb. 20, 1979 | 79-009 -- CONCEPTUAL SPACE CONSTRUCTION EQUIPMENT TESTED |
| Feb. 20, 1979 | 79-010 -- TENTH LUNAR AND PLANETARY SCIENCE CONFERENCE |
| Feb. 20, 1979 | 79-011 -- SCIENCE SESSIONS OPEN TO THE PUBLIC |
| Feb. 23, 1979 | 79-012 -- NASA TO MOVE SPACE SHUTTLE ORBITER TO FLORIDA |
| Feb. 28, 1979 | 79-013 -- NASA BUYS "SUPER GUPPY" TO HAUL SPACE HARDWARE |
| Feb. 28, 1979 | 79-014 -- NASA SELECTS GE SUBSIDIARY FOR LIFE SCIENCES CONTRACT |
| March 1, 1979 | 79-015 -- NEW MEXICO LAKEBED AIRSTRIP NAMED AS SHUTTLE BACKUP LANDING SITE |
| March 19, 1979 | 79-017 -- AT 18 YEARS OLD, SHE MANS A MISSION CONTROL CONSOLE |
| March 30, 1979 | 79-018 -- JSC EXPANDS CENTER TOUR |
| March 28, 1979 | 79-019 -- NASA PICKS SERV-AIR TO MAINTAIN 747 CARRIER AIRCRAFT |
| April 8, 1979 | 79-020 -- SCHOOLING OF ASTRONAUTS, 35 NEW CANDIDATES IS VARIED, EXCITING |
| April 18, 1979 | 79-021 -- JSC SELECTS METRO SERVICES FOR LOGISTICS CONTRACT TALKS |
| April 18, 1979 | 79-022 -- JSC HOSTS THE 13TH AEROSPACE MECHANISMS SYMPOSIUM |
| April 25, 1979 | 79-023 -- NASA SIGNS ADD-ONS TO ORBITER CONTRACT |
| May 4, 1979 | 79-024 -- JSC DEPUTY DIRECTOR SJOBERG RETIRES |
| May 1, 1979 | 79-025 -- NASA AIRCRAFT SURVEYS ARCTIC ICE |
| May 14, 1979 | 79-026 -- JSC DEPUTY DIRECTOR OF SAFETY ASSIGNED TO THREE MILE ISLAND TASK GROUP |
| May 23, 1979 | 79-034 -- ASTRONAUT FRED HAISE TO RESIGN FROM NASA |
| May 29, 1979 | 79-035 -- NASA TO PRESENT THE AEROSPACE EDUCATION SERVICES PROJECT |
| May 25, 1979 | 79-036 -- RMS CONTRACT AWARD |
| June 1, 1979 | 79-037 -- SKYLAB MANEUVER PLAN |
| June 1, 1979 | 79-038 -- NASA SIGNS SUPPLEMENT TO IBM CONTRACT |
| June 4, 1979 | 79-039 -- KLEINKNECHT ASSUMES NEW ROLE |
| June 6, 1979 | 79-040 -- NASA EXTENDS NORTHROP AIRCRAFT MAINTENANCE CONTRACT |
| June 6, 1979 | 79-041 -- MCCALL'S SPACE MURAL TO BE DEDICATED JUNE 14 |
| June 7, 1979 | 79-042 -- ENGLAND RETURNS TO ASTRONAUT PROGRAM |
| June 8, 1979 | 79-043 -- PAN AM CONTRACT RENEWED AT JSC |
| June 11, 1979 | 79-044 -- SUMMER SPACE PROGRAM BRIEFINGS |
| June 15, 1979 | 79-045 -- NASA WILL TRY TO ADJUST SKYLAB'S ATTITUDE |
| June 15, 1979 | 79-046 -- GARTRELL RETIRES |
| July 2, 1979 | 79-047 -- ASTRONAUT CANDIDATE KATHRYN SULLIVAN SETS ALTITUDE RECORD |
| July 3, 1979 | 79-048 -- NASA MODIFIES ROCKWELL ORBITER CONTRACT |
| July 10, 1979 | 79-049 -- JOHNSON SPACE CENTER TO HOLD OPEN HOUSE FOR TENTH ANNIVERSARY OF MAN'S LANDING ON THE MOON |
| Aug. 1, 1979 | 79-050 -- NASA TO RECRUIT SPACE SHUTTLE ASTRONAUTS |
| Aug. 10, 1979 | 79-051 -- CHARLESWORTH NAMED ACTING DEPUTY DIRECTOR OF JOHNSON SPACE CENTER |
| Aug. 24, 1979 | 79-052 -- JSC SELECTS PAN AMERICAN FOR ENGINEERING SUPPORT CONTRACT TALKS |
| Aug. 31, 1979 | 79-053 -- 35 ASTRONAUT CANDIDATES COMPLETE TRAINING AND EVALUATION PERIOD |
| Aug. 31, 1979 | 79-054 -- DSAD DIRECTOR BILL TINDALL TO RETIRE FROM NASA |
| Sept. 10, 1979 | 79-055 -- NASA TESTS NEW SPACE MANEUVERING BACKPACK |
| Sept. 12, 1979 | 79-056 -- HISPANICS ARE ENCOURAGED TO APPLY FOR ASTRONAUT PROGRAM |
| Sept. 20, 1979 | 79-058 -- ASTRONAUTS MAY REPAIR ORBITER HEAT SHIELD IN FLIGHT |
| Sept. 24, 1979 | 79-059 -- SPECIAL AEROSPACE MEDICINE COURSE SCHEDULED |
| Sept. 27, 1979 | 79-060 -- NASA SUPPLEMENTS ORBITER CONTRACT |
| Sept. 28, 1979 | 79-061 -- KOONS NAMED TO NEW POST |
| Sept. 28, 1979 | 79-062 -- TRW TO ANALYZE SHUTTLE AVIONICS |
| Oct. 2, 1979 | 79-063 -- NASA TO DEVELOP MANNED MANEUVERING UNIT |
| Oct. 16, 1979 | 79-064 -- HEADS UP DISPLAY FOR ORBITER |
| Oct. 19, 1979 | 79-065 -- "US, SOVIET SPACE MEDICINE GROUP TO MEET 10TH TIME" |
| Oct. 29, 1979 | 79-066 -- MATSCO GETS NASA LIFE SCIENCES PAYLOADS CONTRACT |
| Nov. 14, 1979 | 79-067 -- NASA NEGOTIATES WITH WESTHEIMER RIGGING FOR SUPPORT CONTRACT |
| Nov. 28, 1979 | 79-068 -- NASA NEGOTIATES WITH ALPHA FOR CONSTRUCTION CONTRACT |
| Dec. 11, 1979 | 79-073 -- ORBITER INTEGRATED TEST |
| Dec. 11, 1979 | 79-074 -- "NASA RECEIVES 3,278 APPLICANTS FOR ASTRONAUT PROGRAM" |
| + 1980 News Releases (3.4 Mb PDF file) | |
| Date | Title |
| Jan. 10, 1980 | 80-001 -- NASA EXTENDS BOEING SAFETY/QUALITY SUPPORT CONTRACT |
| Jan. 16, 1980 | 80-002 -- SYMPOSIUM ON WOMEN IN AEROSPACE TO TAKE PLACE AT JSC MARCH 12-13 |
| Jan. 21, 1980 | 80-003 -- 30-HOUR SIMULATION |
| Jan. 22, 1980 | 80-004 -- MARTIN RECEIVES TPS REPAIR CONTRACT |
| Jan. 25, 1980 | 80-005 -- IBM AWARDED CONTRACT FOR ORBITER DATA PROCESSOR MAINTENANCE |
| Feb. 5, 1980 | 80-006 -- BLACK HISTORY MONTH PROGRAM SET FOR JSC Feb. 15 |
| Feb. 20, 1980 | 80-007 -- NASA BEGINS SCREENING ASTRONAUT APPLICANTS |
| Feb. 25, 1980 | 80-008 -- WOMEN IN AVIATION AND SPACE SYMPOSIUM MARCH 12 & 13 |
| Feb. 26, 1980 | 80-010 -- LUNAR AND PLANETARY CONFERENCE WIL BE MARCH 17-21 IN HOUSTON |
| Feb. 27, 1980 | 80-009 -- NASA SYMPOSIUM '80 TO BE HELD AT KELLY AIR FORCE BASE |
| Feb. 29, 1980 | 80-012 -- NASA SIGNS MARTIN MARIETTA TO BUILD MANNED MANEUVERING UNIT |
| March 3, 1980 | 80-011 -- NASA DEVELOPS SYSTEM FOR HEAT TREATMENT OF CANCER |
| March 4, 1980 | 80-013 -- NASA INTERVIEWS SECOND GROUP OF ASTRONAUT APPLICANTS |
| March 5, 1980 | 80-014 -- NASA EXTENDS LOCKHEED WHITE SANDS CONTRACT |
| March 10, 1980 | 80-015 -- PORTRAIT OF GODDARD UNVEILING MARCH 17, 1980 AT SPACE CENTER MARKS 54TH ANNIVERSARY OF ROCKET |
| March 20, 1980 | 80-016 -- LABORATORY AT SPACE CENTER TESTS AND RETESTS SHUTTLE AVIONICS SYSTEMS |
| March 20, 1980 | 80-017 -- NASA SCREENS THIRD ASTRONAUT APPLICANT GROUP |
| March 21, 1980 | 80-018 -- BOEING AWARDED SOC CONTRACT |
| April 1, 1980 | 80-020 -- GOSSAMER ALBATROSS CRAFT TO BE ON DISPLAY AT SPACE CENTER APRIL 3-28 |
| April 2, 1980 | 80-019 -- SPACE CENTER SCREENS FOURTH GROUP OF ASTRONAUT APPLICANTS |
| April 10, 1980 | 80-022 -- NASA SATELLITE TO AID TIMBER INDUSTRY IN MANAGING FOREST LANDS |
| April 11, 1980 | 80-021 -- FIRST SHUTTLE CREW TRAINS FOR PARACHUTE WATER LANDINGS |
| April 14, 1980 | 80-023 -- NASA SIGNS CANADIANS TO BUILD SHUTTLE ROBOT ARM |
| April 17, 1980 | 80-024 -- NASA INTERVIEWS FIFTH ASTRONAUT APPLICANT GROUP |
| April 17, 1980 | 80-025 -- 54-HOUR SIMULATION |
| April 25, 1980 | 80-026 -- NASA SCREENS SIXTH ASTRONAUT APPLICANT GROUP |
| April 28, 1980 | 80-027 -- NASA AWARDS UNIVAC DATA PROCESSING CONTRACT |
| April 30, 1980 | 80-028 -- VISITORS TO SPACE CENTER CAN WALK THROUGH NEW SPACE SHUTTLE CARGO BAY DISPLAY |
| May 1, 1980 | 80-029 -- NASA CONTRACTS DRAPER LAB FOR SHUTTLE AVIONICS SOFTWARE |
| May 1, 1980 | 80-030 -- SHUTTLE COLUMBIA'S FLIGHT ENGINES TO BE RETESTED |
| May 9, 1980 | 80-032 -- SPACE SOLAR CELL CONTRACT |
| May 9, 1980 | 80-033 -- FEDERAL WOMEN'S PROGRAM WEEK, MAY 13-16 |
| May 12, 1980 | 80-034 -- COMPLEX SIM TEST RMS |
| May 13, 1980 | 80-035 -- BARRIOS SELECTED FOR CONTRACT NEGOTIATIONS |
| May 15, 1980 | 80-036 -- COLUMBIA FLIGHT ENGINES RETEST SCHEDULED |
| May 27, 1980 | 80-037 -- ORBITAL FLIGHT TEST PROGRAM EXTENDED |
| May 29, 1980 | 80-038 -- NASA SELECTS 19 ASTRONAUT CANDIDATES |
| June 10, 1980 | 80-039 -- INVESTIGATORS FILE REPORT ON CAUSE OF SPACESUIT BACKPACK FIRE |
| June 27, 1980 | 80-040 -- SPACE CENTER ENGINEERS STUDY FUTURE SPACE CONSTRUCTION METHODS |
| June 27, 1980 | 80-042 -- JSC NAMES HARLAN TO SAFETY/QUALITY POST |
| June 30, 1980 | 80-041 -- NEW ASTRONAUT CANDIDATES REPORT FOR TRAINING |
| July 9, 1980 | 80-043 -- LOCAL HIGH SCHOOL STUDENTS WORK AT JSC THIS SUMMER |
| July 2, 1980 | 80-044 -- MARTIN MARIETTA TO BUILD SPACE SHUTTLE ORBITER TILE REPAIR KITS |
| July 7, 1980 | 80-045 -- TWO EUROPEANS ACCEPTED FOR SPACE SHUTTLE MISSION SPECIALIST TRAINING |
| July 23, 1980 | 80-046 -- CAN PLASMA IN THE IONOSPHERE BE USED TO AUGMENT SPACE SOLAR POWER? |
| July 23, 1980 | 80-047 -- FEMALE AIR FORCE ACADEMY GRAD AT JSC |
| July 24, 1980 | 80-048 -- NASA EXTENDS NORTHROP AIRCRAFT MAINTENANCE CONTRACT |
| Aug. 7, 1980 | 80-049 -- ASTRONAUT CANDIDATES ATTEND WATER SURVIVAL SCHOOL |
| Aug. 20, 1980 | 80-050 -- NEW WATER TANK HELPS TRAIN FOR SPACE ZERO GRAVITY |
| Aug. 27, 1980 | 80-051 -- TWO AEROSPACE FIRMS GET SATELLITE SERVICE SYSTEMS CONTRACT |
| Aug. 27, 1980 | 80-053 -- ENGINEERING AND OPERATIONS SUPPORT CONTRACT AWARDED |
| Sept. 2, 1980 | 80-052 -- SHUTTLE CREWMAN TO SEND LIVE PICTURES ON SPACEWALK |
| Sept. 9, 1980 | 80-054 -- LAB DISTILLS WASTE WATER FOR REUSE IN FLIGHT |
| Sept. 16, 1980 | 80-055 -- LIGHTER THAN THE LIGHTEST… STRONGER THAN THE STRONGEST. IT'S SUPERMETAL! |
| Sept. 19, 1980 | 80-056 -- 54-HOUR SIMULATION |
| Oct. 1, 1980 | 80-057 -- ASTRONAUT GIBSON LEAVES NASA TO JOIN TRW |
| Oct. 1, 1980 | 80-058 -- SPACE CENTER NEGOTIATES FIRE AND SAFETY CONTRACT |
| Oct. 14, 1980 | 80-060 -- SPACE SHUTTLE TO CARRY SPACE TOOLBOX |
| Oct. 16, 1980 | 80-061 -- SPACESUIT LIFE SUPPORT SYSTEM ENDS 14-HOUR TEST |
| Oct. 17, 1980 | 80-059 -- 54-HOUR SIMULATION |
| Oct. 28, 1980 | 80-062 -- SUN POWER KIT PROPOSED FOR SHUTTLE |
| Nov. 26, 1980 | 80-063 -- 56-HOUR SIMULATION |
| Dec. 3, 1980 | 80-066 -- DR. FROSCH AT JSC 12/8/80 |
| Dec. 5, 1980 | 80-064 -- SHUTTLE-ERA SPACE SUIT |
| Dec. 11, 1980 | 80-065 -- NASA ANNOUNCES NEW FIRE RESISTANT MATERIAL FOR AIRCRAFT |