| Jan. 6, 1966 | 66-001 -- EVALUATION OF APPLICATIONS FOR ASTRONAUT PROGRAM |
| Jan. 7, 1966 | 66-002 -- ACCEPTANCE OF 65-FT DIAMETER VACUUM CHAMBER BY MSC |
| Jan. 10, 1966 | 66-003 -- CHECKOUT OF HOMING APOLLO EQUIPMENT |
| Jan. 12, 1966 | 66-004 -- VERIFICATION TESTS ON APOLLO FUEL CELLS |
| Jan. 21, 1966 | 66-005 -- S&ISD CONTRACT CHANGED TO COST-PLUS-INCENTIVE AGREEMENT |
| Jan. 17, 1966 | 66-006 -- D.K. SLAYTON TO RECEIVE HONORARY DOCTOR OF ENGINEERING DEGREE FROM MICHIGAN TECHNOLOGICAL UNIVERSITY |
| Jan. 26, 1966 | 66-007 -- MOON SURFACE EXPERIMENTS CHOSEN FOR APOLLO |
| Jan. 27, 1966 | 66-012 -- EISELE TO HAVE OPERATION ON LEFT SHOULDER |
| Feb. 1, 1966 | 66-010 -- LAUNCH DATE FOR SATURN IB |
| Feb. 2, 1966 | 66-008 -- CONTRACT AWARDED TO RODANA RES. CORP. FOR DEVELOPMENT OF EMERGENCY MEDICAL KITS FOR APOLLO |
| Feb. 2, 1966 | 66-009 -- LUNAR TOOLS |
| Feb. 3, 1966 | 66-011 -- DEMONSTRATION TEST ON SATURN IB |
| Feb. 11, 1966 | 66-013 -- APOLLO-SATURN SLIPS TO Feb. 23, 1966 |
| Feb. 15, 1966 | 66-014 -- CONVERSION OF GRUMMAN LEM CONTRACT |
| Feb. 18, 1966 | 66-015 -- ACOUSTICS IN SPACECRAFT ACOUSTIC LABORATORY |
| Feb. 17, 1966 | 66-016 -- LAUNCH DATE OF GEMINI 8 ANNOUNCED |
| March 7, 1966 | 66-017 -- APOLLO LANDING |
| March 7, 1966 | 66-018 -- ACCOMPLISHMENT OF TEST OBJECTIVES ON AS-1B |
| March 10, 1966 | 66-019 -- NASA/DOD EXPERIMENT D-16 |
| March 21, 1966 | 66-020 -- GEMINI AND APOLLO CREWS SELECTED |
| March 30, 1966 | 66-021 -- FLIGHT DIRECTOR ASSIGNMENTS |
| April 4, 1966 | 66-022 -- NINETEEN NEW ASTRONAUTS NAMED |
| April 4, 1966 | 66-023 -- CHANGE IN SEQUENCE OF NEXT TWO APOLLO SATURN IB LAUNCHES |
| April 12, 1966 | 66-024 -- TRAFFIC AND PARKING |
| April 12, 1966 | 66-025 -- ROBERT SMYLIE TO RECEIVE SLOAN FELLOWSHIP |
| April 14, 1966 | 66-026 -- FIRST PRODUCTION-LINE APOLLO COMMAND MODULE |
| April 18, 1966 | 66-027 -- T-30 GEMINI 9 RELEASE |
| April 21, 1966 | 66-028 -- SPENT SATURN S-IVB STAGE CONTRACT |
| April 28, 1966 | 66-029 -- RESULT OF GEMINI 8 - CHARLES MATHEWS |
| April 28, 1966 | 66-030 -- PLANS FOR MSC BUSINESS CONFERENCE |
| May 10, 1966 | 66-031 -- FIRST MAN TO RIDE THE MSC CENTRIFUGE |
| May 18, 1966 | 66-033 -- RE-SCHEDULING OF GT-9 |
| May 20, 1966 | 66-034 -- 38 GRADUATE STUDENTS OFFERED STUDY & WORK AT MSC |
| May 20, 1966 | 66-035 -- FIRST MSC AEROSPACE ANALYSIS & WRITING PROGRAM - 25 GRADUATE STUDENTS OFFERED JOBS FOR SUMMER |
| May 20, 1966 | 66-036 -- ANTENNA & ANECHOIC CHAMBER FACILITY & THE OPTICAL FREQUENCY RANGE FACILITY |
| May 20, 1966 | 66-037 -- APOLLO SATURN 500-F |
| June 2, 1966 | 66-038 -- LUNAR OPTICAL RENDEZVOUS SYSTEM (LORS) |
| June 10, 1966 | 66-039 -- TANKS |
| June 10, 1966 | 66-040 -- CONTRACT FOR CENTRAL ELECTRONIC SHOP SUPPORT SERVICES AT MSC |
| June 10, 1966 | 66-041 -- EDUCATIONAL SYMPOSIUM ON TEACHER EDUCATION |
| June 14, 1966 | 66-042 -- DOCKING SIMULATION |
| June 15, 1966 | 66-043 -- RESCHEDULING OF AS-203 |
| June 17, 1966 | 66-044 -- REGIONAL EDUCATION SYMPOSIUM |
| June 19, 1966 | 66-045 -- GEMINI 10 SCHEDULE |
| June 17, 1966 | 66-046 -- PRIME CREWMEN FOR GEMINI 12 |
| June 23, 1966 | 66-047 -- OPEN HOUSE TO BE HELD ON A LIMITED BASIS, JUNE 26, 1966 |
| July 7, 1966 | 66-048 -- SATURN APOLLO APPLICATIONS PROGRAM OFFICE ESTABLISHED |
| July 6, 1966 | 66-049 -- FINAL TEST ON APOLLO SATURN 203 COMPLETED |
| July 7, 1966 | 66-050 -- ZIA CORP. CONTRACT AWARDED |
| July 11, 1966 | 66-051 -- AS 202 LAUNCH DATE ANNOUNCED |
| July 15, 1966 | 66-052 -- MSC CANCELS TWO CONTRACTS |
| July 20, 1966 | 66-053 -- CONFERENCE FOR SCIENCE FAIR WINNERS |
| July 28, 1966 | 66-054 -- FIRST MAJOR TEST OF MANNED APOLLO SPACECRAFT AT MSC |
| Aug. 1, 1966 | 66-055 -- GRADUATION OF 3 SCIENTIST-ASTRONAUTS FROM FLIGHT SCHOOL |
| Aug. 1, 1966 | 66-056 -- AWARD OF CONTRACT TO WARRIOR CONSTRUCTORS |
| Aug. 1, 1966 | 66-057 -- BIDS ON CONSTRUCTION OF LUNAR RECEIVING LABORATORY |
| Aug. 3, 1966 | 66-058 -- APOLLO COMPLEX TO BE CONVERTED IN IBM CONTRACT |
| Aug. 4, 1966 | 66-059 -- 14-DAY STATIC FIRING SIMULATION OF APOLLO MISSION |
| Aug. 9, 1966 | 66-060 -- EIGHT-DAY MANNED APOLLO SYSTEMS TEST IN VACUUM CHAMBER |
| Aug. 10, 1966 | 66-061 -- RESCHEDULING OF THE AS-202 MISSION |
| Aug. 10, 1966 | 66-062 -- ANNOUNCEMENT OF GT-11 LAUNCH DATE |
| Aug. 12, 1966 | 66-063 -- FIRST MANNED APOLLO FLIGHT |
| Aug. 12, 1966 | 66-064 -- AS-202 SLIPS FROM Aug. 22 TO Aug. 25, 1966 |
| Aug. 15, 1966 | 66-065 -- DEATH OF GEORGE LEMKE |
| Aug. 19, 1966 | 66-066 -- NASA SELECTS CONTRACTOR FOR AIRLOCK EXPERIMENTS |
| Aug. 19, 1966 | 66-067 -- CONTRACT AWARDED FOR CONSTRUCTION OF LUNAR RECEIVING LABORATORY |
| Aug. 22, 1966 | 66-068 -- HALT OF HARDWARE DEVELOPMENT & FABRICATION OF APOLLO PALLET |
| Sept. 8, 1966 | 66-069 -- RESIGNATION OF DR. WINSTON E. KOCK |
| Sept. 22, 1966 | 66-070 -- REQUEST FOR MORE SCIENTIST-ASTRONAUTS |
| Sept. 23, 1966 | 66-071 -- FIRST APOLLO LUNAR MODULE (LM) ARRIVES AT KSC |
| Sept. 27, 1966 | 66-071A -- REVISED GEMINI 12 EVA |
| Sept. 29, 1966 | 66-072 -- SECOND MANNED APOLLO CREW NAMED |
| Oct. 13, 1966 | 66-073 -- FIRST NASA INTER-CENTER COMPUTER NETWORK |
| Oct. 9, 1966 | 66-074 -- APOLLO ORBITAL WORKSHOP |
| Oct. 5, 1966 | 66-075 -- LOUIS NIZER TO REPLACE HARRY BATTEN |
| Oct. 13, 1966 | 66-076 -- MAN'S WIERDEST FLYING MACHINE (LLRV) |
| Oct. 5, 1966 | 66-077 -- REEFING CUTTER |
| Oct. 10, 1966 | 66-078 -- GEMINI 12, T-30 RELEASE |
| Oct. 28, 1966 | 66-079 -- UNIVERSITY OF HOUSTON GRANTED CONTRACT FOR "A CHRONOLOGY OF PROJECT GEMINI" AND "A HISTORY OF PROJECT GEMINI" |
| Oct. 27, 1966 | 66-080 -- DEVELOPMENT OF 4 HIGH-FREQUENCY TRANSMITTERS IN WORLDWIDE COMMUNICATIONS TESTS |
| Oct. 28, 1966 | 66-081 -- DELAY IN THE LAUNCHING OF AS 204 |
| Nov. 2, 1966 | 66-082 -- SPACECRAFT 008 TEST COMPLETION |
| Nov. 2, 1966 | 66-083 -- AWARD OF CONTRACT TO LINK, GENERAL PRECISION |
| Nov. 8, 1966 | 66-084 -- RESULTS OF APOLLO SERVICE MODULE PRESSURE FAILURE TEST |
| Nov. 14, 1966 | 66-085 -- PATENTS AWARDED TO MSC PERSONNEL |
| Nov. 17, 1966 | 66-086A -- RESCHEDULING OF APOLLO-SATURN FLIGHTS |
| Nov. 29, 1966 | 66-086 -- F. JOHN BAILEY AWARD |
| Nov. 29, 1966 | 66-087 -- RICHARD R. CARLEY AWARD |
| Nov. 29, 1966 | 66-088 -- HENRY E. CLEMENTS AWARD |
| Nov. 29, 1966 | 66-089 -- DUNCAN COLLINS AWARD |
| Nov. 29, 1966 | 66-090 -- HOMER DOTTS AWARD |
| Nov. 29, 1966 | 66-091 -- W.H. GRAY AWARD |
| Nov. 29, 1966 | 66-092 -- DICK JOHNSTON AWARD |
| Nov. 29, 1966 | 66-093 -- EUGENE KRANZ AWARD |
| Nov. 29, 1966 | 66-094 -- JOHN MAYER AWARD |
| Nov. 29, 1966 | 66-095 -- ANDRE MEYER AWARD |
| Nov. 29, 1966 | 66-096 -- WILLIS MITCHELL AWARD |
| Nov. 29, 1966 | 66-097 -- WARREN NORTH AWARD |
| Nov. 29, 1966 | 66-098 -- ROBERT PILAND AWARD |
| Nov. 29, 1966 | 66-099 -- JOHN E. ROBERTS - NORFOLK AWARD |
| Nov. 29, 1966 | 66-100 -- JOHN E. ROBERTS - LEXINGTON PARK, MD AWARD |
| Nov. 29, 1966 | 66-101 -- SCOTT SIMPKINSIN AWARD |
| Nov. 29, 1966 | 66-102 -- SIG SJOBERG AWARD |
| Nov. 29, 1966 | 66-103 -- HOWARD TINDALL AWARD |
| Nov. 29, 1966 | 66-104 -- JAMES GARREPY AWARD |
| Nov. 29, 1966 | 66-105 -- CLYDE TEAGUE AWARD |
| Nov. 29, 1966 | 66-106 -- ALLEN ROCHFORD AWARD |
| Nov. 29, 1966 | 66-107 -- JOSEPH SCHMITT AWARD |
| Nov. 30, 1966 | 66-108 -- CHARLES W. MATHEWS NAMED DIRECTOR OF SATURN APOLLO APPLICATIONS OFFICE |
| Nov. 30, 1966 | 66-109 -- LTV AEROSPACE (LING-TEMCO-VOUGHT) GRANTED CONTRACT |
| Dec. 22, 1966 | 66-110 -- NAMING OF SECOND AND THIRD APOLLO CREWS |
| Dec. 22, 1966 | 66-111 -- AWARD RESCUE - CSD |
| + 1967 News Releases (3.8 Mb PDF file) | |
| Date | Title |
| Jan. 3, 1967 | 66-112 -- APPLICATIONS FOR SCIENTISTS & ENGINEER ASTRONAUTS |
| Jan. 6, 1967 | 67-001 -- SCHOLARSHIP FUND FOR MSC EMPLOYEES' CHILDREN |
| Jan. 6, 1967 | 67-002 -- 6-DAY TEST OF APOLLO S&C AND RCS ENGINES |
| Jan. 6, 1967 | 67-003 -- AWARDS FOR EMPLOYEES FOR ROLES IN APOLLO TEST PROGRAMS IN SPACE ENVIRONMENT SIM. LAB & VIBRATION & ACOUSTIC TEST FACILITY |
| Jan. 16, 1967 | 67-004 -- NEW DIRECTORATE SCIENCE & APPLICATIONS DIRECTORATE |
| Jan. 23, 1967 | 67-005 -- T-30 ANNOUNCEMENT OF A/S 204 MISSION |
| Jan. 27, 1967 | 67-006 -- GEMINI SUMMARY CONFERENCE |
| Jan. 27, 1967 | 67-007 -- SATURN V S-4B EXPLOSION |
| Feb. 13, 1967 | 67-008 -- DR. HESS APPOINTED DIRECTOR OF SCIENCE & APPLICATIONS DIRECTORATE |
| March 15, 1967 | 67-009 -- NASA ORDERS MOON LANDING JET TRAINER (LLTV) |
| March 16, 1967 | 67-010 -- 1ST LUNAR SAMPLE SET FOR EXPERIMENTS BY 110 SCIENTISTS |
| March 24, 1967 | 67-011 -- SCIENCE FAIR WINNERS |
| March 30, 1967 | 67-012 -- 5 MSC EMPLOYEES GET PATENT AWARDS |
| March 27, 1967 | 67-013 -- WARREN J. NORTH TO PRESENT TECHNICAL PAPER |
| April 5, 1967 | 67-014 -- SHEA/LOW PERSONNEL CHANGES |
| April 12, 1967 | 67-015 -- DR. GILRUTH TO RECEIVE AAS AWARD, MAY 3 |
| April 13, 1967 | 67-016 -- HEAVY LIFT RECOVERY HELICOPTER TESTS FOR APOLLO |
| April 24, 1967 | 67-017 -- CONTRACT AWARDED TO MIT |
| April 27, 1967 | 67-018 -- "ROLLING STONE" ON SURFACE OF MOON |
| May 2, 1967 | 67-019 -- INTERAGENCY DATA EXCHANGE PROGRAM (IDEP) WORKSHOP |
| May 5, 1967 | 67-020 -- EVA CONTRACT AWARD TO ROCKET RESEARCH CORP. |
| May 8, 1967 | 67-021 -- CERTIFICATE OF ACHIEVEMENT GIVEN TO LEMUEL S. MENEAR |
| May 9, 1967 | 67-022 -- 1ST MANNED APOLLO CREW PRESS CONFERENCE ANNOUNCEMENTS |
| May 19, 1967 | 67-023 -- CONTRACT GIVEN TO WACKENHUT SERVICES, INC. |
| May 22, 1967 | 67-024 -- MEMBERS SELECTED FOR INTERAGENCY DATA EXCHANGE |
| May 23, 1967 | 67-025 -- LAND AND WATER IMPORT FACILITY |
| May 25, 1967 | 67-026 -- MSC OPERATION, SPAN |
| May 25, 1967 | 67-027 -- APOLLO BOILERPLATE SUNK AFTER BREAKING OF TOWLINE |
| May 26, 1967 | 67-028 -- THREE WESTHEIMER RIGGING CO. EMPLOYEES INJURED (ONE KILLED) AT MSC BY ELECTRICAL SHOCK |
| June 1, 1967 | 67-029 -- JOHN DORNBACH RECEIVES DOCTORATE DEGREE |
| June 6, 1967 | 67-030 -- DEATH OF ASTRONAUT EDWARD G. GIVENS, JR. |
| June 7, 1967 | 67-031 -- FUNERAL ARRANGEMENT FOR ASTRONAUT GIVENS |
| June 13, 1967 | 67-032 -- ROBERT A. GARDINER NAMED CHIEF OF GUIDANCE & CONTROL |
| June 14, 1967 | 67-033 -- CHANGED IN APOLLO LM HARDWARE, MATERIALS PROCEDURES & TASKS |
| June 14, 1967 | 67-034 -- CONTRACT AWARD TO MELPAR, INC. |
| June 16, 1967 | 67-035 -- CONTRACT AWARD TO BOEING COMPANY |
| June 21, 1967 | 67-036 -- DOCTORATE DEGREES HELD BY ASTRONAUTS |
| June 22, 1967 | 67-037 -- TOUR & BRIEFING OF LRL |
| June 29, 1967 | 67-038 -- EXTENSION OF CONTRACT FOR PHILCO-FORD ON MCC |
| June 29, 1967 | 67-039 -- CONFERENCE AT SANTA CRUZ, CALIFORNIA |
| July 7, 1967 | 67-040 -- PATENTS AWARDED NASA MSC PERSONNEL |
| July 11, 1967 | 67-041 -- CONTRACT-AWARD TO GRAHAM & LTV |
| July 11, 1967 | 67-042 -- CONTRACT AWARD TO BROWN & ROOT-NORTHRUP |
| July 25, 1967 | 67-043 -- GEN. BOLENDER OF NASA HQ. NAMED MANAGER OF LM |
| Aug. 4, 1967 | 67-044 -- SELECTION OF 11 SCIENTIST-ASTRONAUTS |
| July 26, 1967 | 67-045 -- CONTRACT AWARD TO BOEING |
| July 26, 1967 | 67-046 -- CONTRACT AWARD TO MARTIN MARIETTA |
| July 31, 1967 | 67-047 -- W.C. SCHNEIDER NAMED APOLLO MISSION DIRECTOR |
| Aug. 2, 1967 | 67-048 -- CONTRACT AWARD TO NORTH AMERICAN AVIATION ROCKETDYNE |
| Aug. 3, 1967 | 67-049 -- SCOTT CARPENTER DETACHED FROM MSC |
| Aug. 10, 1967 | 67-050 -- CONTRACT TO RCA DEFENSE ELECTRONICS DIVISION FOR DUAL SPACE SUIT COMMUNICATIONS SYSTEM |
| Aug. 11, 1967 | 67-051 -- FIRST APOLLO SATURN 5 ROLLED OUT OF VAP |
| Aug. 11, 1967 | 67-052 -- PRESS CONFERENCE AT DOUGLAS SACRAMENTO |
| Aug. 17, 1967 | 67-053 -- ARRIVAL OF APOLLO SPACE SUITS IN Sept. |
| Sept. 19, 1967 | 67-054 -- BIOLOGICAL ISOLATION GARMENT FOR APOLLO CREW |
| Sept. 5, 1967 | 67-055 -- 3-DAY LRL BRIEFING AT MSC |
| Sept. 29, 1967 | 67-056 -- LTV AWARDED MAINTENANCE CONTRACT |
| Oct. 5, 1967 | 67-057 -- AN ASTRONAUT WAS REPORTED KILLED IN CRASH |
| Oct. 5, 1967 | 67-058 -- MAJOR C.C. WILLIAMS WAS NAMED AS ASTRONAUT KILLED |
| Oct. 6, 1967 | 67-059 -- FUNERAL SERVICES ANNOUNCED FOR ASTRONAUT WILLIAMS |
| Oct. 6, 1967 | 67-060 -- REQUIEM SERVICES SET FOR ASTRONAUT WILLIAMS |
| Oct. 9, 1967 | 67-061 -- 200 MEMBERS OF JETS TO PARTICIPATE IN FIELD TRIP AT MSC |
| Oct. 12, 1967 | 67-062 -- MAJOR CHANGES IN TOP NASA POSITIONS ANNOUNCED |
| Oct. 13, 1967 | 67-063 -- GRUMMAN AIRCRAFT TO DELIVER LM-2 TO NASA |
| Oct. 20, 1967 | 67-064 -- NASA SELECTS BENDIX CORP., DETROIT FOR LONG DURATION CRYOGENIC GAS STORAGE TANKS |
| Oct. 20, 1967 | 67-065 -- NASA EXTENDED ITS CONTRACT WITH FEDERAL ELECTRIC |
| Nov. 7, 1967 | 67-066 -- NASA EXTENDED CONTRACT WITH TRW, REDONDO BEACH |
| Nov. 20, 1967 | 67-067 -- FLIGHT CREWS FOR SECOND & THIRD FLIGHTS |
| Dec. 4, 1967 | 67-068 -- APOLLO 4 RESULTS |
| Dec. 4, 1967 | 67-069 -- MAN RATING APOLLO SUITS |
| Dec. 7, 1967 | 67-070 -- NEGOTIATION CONTROL AWARDED TO CONTROL DATA |
| Dec. 7, 1967 | 67-071 -- CONTINUATION OF NA ROCKWELL CONTRACT |
| Dec. 7, 1967 | 67-072 -- DELIVERY OF THREE LUNAR LANDING TRAINING VEHICLES (LLTV) |
| Dec. 8, 1967 | 67-073 -- ROBERT THOMPSON APPOINTED MANAGER AAP |
| Dec. 21, 1967 | 67-074 -- SUCCESSFUL PARACHUTE TEST AT EL CENTRO, CALIFORNIA |
| Dec. 22, 1967 | 67-075 -- RESIGNATION OF J. THOMAS MARKLEY, ASSISTANT MANAGER ASPO |
| Dec. 26, 1967 | 67-076 -- APOLLO 5 SCHEDULE |
| + 1968 News Releases (4.8 Mb PDF file) | |
| Date | Title |
| Jan. 15, 1968 | 68-001 -- FLAMMABILITY TESTING |
| Jan. 19, 1968 | 68-002 -- TWO TOP-LEVEL MANAGEMENT POSITIONS MANNED AT MSC |
| Jan. 27, 1968 | 68-003 -- FLAMMABILITY TESTING |
| Jan. 27, 1968 | 68-004 -- APOLLO 5 QUICK-LOOK RELEASE |
| Jan. 30, 1968 | 68-005 -- SHIPMENT OF SECOND APOLLO LM |
| Feb. 5, 1968 | 68-006 -- ANTHONY J. CALIO NAMED DEPUTY DIRECTOR FOR PROJECTS FOR THE SCIENCE & APPLICATIONS DIRECTORATE |
| Feb. 7, 1968 | 68-007 -- THIRD SERIES OF FLAMMABILITY TESTS ANNOUNCED |
| Feb. 8, 1968 | 68-008 -- FIVE LANDING AREAS SELECTED BY NASA APOLLO SITE SELECTION BOARD |
| Feb. 15, 1968 | 68-009 -- RELOCATION OF MSC NEWS CENTER |
| Feb. 20, 1968 | 68-010 (missing) -- T-30 APOLLO 6 NEWS RELEASE |
| Feb. 28, 1968 | 68-011 -- SLIP IN APOLLO 6 LAUNCH DATE |
| Feb. 28, 1968 | 68-012 -- FLIGHT TRAINING TO START FOR SCIENTIST ASTRONAUTS |
| March 1, 1968 | 68-013 -- PRESIDENT JOHNSON'S VISIT TO MSC |
| March 11, 1968 | 68-014 -- ANOTHER SLIP IN APOLLO 6 LAUNCH |
| March 12, 1968 | 68-015 -- NASA NSTA YOUTH SCIENCE CONGRESS - OKLAHOMA CITY |
| March 12, 1968 | 68-016 -- NASA NSTA YOUTH SCIENCE CONGRESS - HOUSTON |
| March 11, 1968 | 68-017 -- NASA NSTA YOUTH SCIENCE CONGRESS - ENID, OKLAHOMA |
| March 11, 1968 | 68-018 -- NASA NSTA YOUTH SCIENCE CONGRESS - EL CAMPO, TEXAS |
| March 11, 1968 | 68-019 -- NASA NSTA YOUTH SCIENCE CONGRESS - SAN ANTONIO, TEXAS |
| March 11, 1968 | 68-020 -- NASA NSTA YOUTH SCIENCE CONGRESS - BRECKENRIDGE, TEXAS |
| March 12, 1968 | 68-021 -- NASA NSTA YOUTH SCIENCE CONGRESS - SAGINAW, TEXAS |
| March 14, 1968 | 68-022 -- 60/40 LAUNCH PAD ATMOSPHERE ANNOUNCED |
| March 15, 1968 | 68-023 -- LAUNCH SLIP TO APRIL 1 ANNOUNCED |
| March 21, 1968 | 68-024 -- LAUNCH SLIP TO APRIL 3 ANNOUNCED |
| March 22, 1968 | 68-025 -- WILLIAM A. PARKER APPOINTED MANAGER, CENTER SUPPORT PLANNING & CONTROL |
| -- KEY PERSONNEL ASSIGNMENT | |
| March 25, 1968 | 68-026 -- $929,000 CONTRACT TO UNIVERSITY OF CALIFORNIA FOR DEVELOPMENT AND TESTING OF HAPPE ANNOUNCED |
| March 27, 1968 | 68-027 -- NASA MSC AWARDS $649,249 CONTRACT TO SPACE INCORPORATED |
| April 3, 1968 | 68-028 -- KRAFT APPOINTS 3 NEW FLIGHT DIRECTORS |
| April 3, 1968 | 68-029 -- ICELAND MISSION "SEA STATE" |
| April 9, 1968 | 68-030 -- APOLLO 6 QUICK LOOK MISSION EVALUATION |
| April 11, 1968 | -- NASA HQ: EVALUATION OF SATURN V VEHICLE |
| April 8, 1968 | 68-031 -- SPACECRAFT 2TV-1 SERVICE MODULE (LUSK) |
| April 22, 1968 | 68-032 -- WITHDRAWAL OF SCIENTIST-ASTRONAUT BRIAN T. O'LEARY FROM ASTRONAUT PROGRAM |
| May 3, 1968 | 68-033 -- BOEING CONTRACT ANNOUNCED |
| May 10, 1968 | 68-034 -- DAVID CLARKE SUIT CONTRACT |
| May 14, 1968 | 68-035 -- REASSIGNMENT OF THREE MSC OFFICIALS |
| May 21, 1968 | 68-036 -- CHANGES IN GRUMMAN AIRCRAFT ENGINEERING CORP. CONTRACT |
| May 22, 1968 | 68-037 -- SOUTH ATLANTIC ANOMALY PROBE |
| May 24, 1968 | 68-038 -- LTA-8 TESTS |
| May 31, 1968 | 68-039 -- ASTRONAUT TRAINING AT PERRIN AFB |
| May 31, 1968 | 68-040 -- JOB FAIR PROGRAM |
| June 4, 1968 | 68-041 -- ROCKETDYNE INJECTOR TO BE USED IN BELL ASCENT ENGINE OF FIRST MANNED LM |
| June 10, 1968 | 68-042 (missing) -- 2TV-1 TESTS BEGIN |
| June 10, 1968 | 68-043 -- LOCKHEED EARTH ORBITAL ESCAPE DEVICE STUDY |
| June 12, 1968 | 68-044 -- SAAP IS SUCCESSFUL |
| June 19, 1968 | 68-045 -- PARTIAL GRAVITY SIMULATOR |
| June 19, 1968 | 68-046 -- NASA-ASEE SUMMER FACULTY FELLOWSHIP PROGRAM |
| July 11, 1968 | 68-047 -- APOLLO APPLICATIONS FLAMMABILITY EXPERIMENT, M-479 |
| July 16, 1968 | 68-048 -- JOHN BULL LEAVES ASTRONAUT PROGRAM |
| July 17, 1968 | 68-049 -- FACILITY INSTALLED IN GULF OF MEXICO FOR LRD |
| July 18, 1968 | 68-050 -- SATURN 5 POGO PROBLEM TESTS |
| July 18, 1968 | 68-051 -- ALSEP - BENDIX CORPORATION |
| July 18, 1968 | 68-052 -- DR. JERRY MODISETTE APPOINTED SENIOR STAFF SCIENTIST |
| July 22, 1968 | 68-053 -- ASTRONAUT MICHAEL COLLINS TO UNDERGO SURGERY |
| July 23, 1968 | 68-054 -- REPORT ON ASTRONAUT MICHAEL COLLINS |
| July 25, 1968 | 68-055 -- REPORT ON ASTRONAUT MICHAEL COLLINS |
| July 25, 1968 | 68-056 -- MSC DUCKS VACCINATED AGAINST BOTULISM |
| July 31, 1968 | 68-057 -- WATER EGRESS TRAINING FOR FIRST MANNED APOLLO CREWS |
| Aug. 2, 1968 | 68-058 -- $10,651,200 CONTRACT MODIFICATION AWARDED TO HAMILTON STANDARD DIVISION, UNITED AIRCRAFT CORPORATION |
| Aug. 7, 1968 | 68-059 -- NASA INVITES 23 AEROSPACE FIRMS TO SUBMIT PROPOSALS FOR ONE-MAN LUNAR FLYING MACHINE (LLTV) |
| Aug. 8, 1968 | 68-060 -- COLLINS AND BULL REPLACEMENTS |
| Aug. 9, 1968 | 68-061 -- MANNED CHECKOUT OF 2TV-1 |
| Aug. 15, 1968 | 68-062 -- NASA MODIFIES IBM CONTRACT FOR RTCC |
| Aug. 19, 1968 | 68-148 -- NASA HQ: LUNAR MODULE OPERATIONS DROPPED |
| Aug. 23, 1968 | 68-063 -- WITHDRAWAL OF LLEWELLYN FROM ASTRONAUT PROGRAM |
| Aug. 27, 1968 | 68-064 -- BELL AEROSYSTEMS EMPLOYEE INJURED IN LUNAR LANDING TRAINING VEHICLE (LLTV) ACCIDENT |
| Aug. 29, 1968 | 68-065 -- PRATT AND WHITNEY FUEL CELL TEST COMPLETED |
| Sept. 4, 1968 | 68-066 -- 2TV-1 MANNED TESTING BEGINS |
| Sept. 4, 1968 | 68-067 -- NASA CONTRACTS WITH SPERRY RAND CORP. FOR CCATS PROCESSORS |
| Sept. 6, 1968 | -- ITINERARY OF RICHARD M. NIXON'S VISIT TO MANNED SPACECRAFT CENTER |
| Sept. 11, 1968 | 68-068 -- PAUL PURSER GRANTED A ONE YEAR LEAVE OF ABSENCE |
| Sept. 13, 1968 | 68-069 -- INTERMEDIATE WORKSHIP BY STONEY |
| Sept. 24, 1968 | 68-070 -- TWO-DAY PROGRAM MARKS 10TH ANNIVERSARY OF NASA |
| Sept. 25, 1968 | 68-071 -- NASA SELECTS ROCKETDYNE INJECTOR FOR USE IN ASCENT ENGINE OF APOLLO LUNAR MODULE |
| Sept. 27, 1968 | 68-072 -- GILRUTH ANNOUNCES ESTABLISHMENT OF AN ADVANCE MISSIONS PROGRAM OFFICE |
| Sept. 27, 1968 | 68-073 -- KARL HENIZE SUFFERS A FRACTURED COLLAR BONE |
| Sept. 30, 1968 | 68-074 -- TENTH ANNIVERSARY HAD AN ESTIMATED 25,000 PERSONS ATTENDING |
| Oct. 1, 1968 | 68-075 -- WILLIAM E. STONEY NAMED DEPUTY DIRECTOR (ENGINEERING) OF APOLLO MANNED LANDING PROGRAM |
| Oct. 3, 1968 | 68-076 -- LLTV AIRCRAFT TEST RUN |
| Oct. 17, 1968 | 68-182 -- NASA HQ: LUNAR LANDING RESEARCH VEHICLE REPORT |
| Oct. 23, 1968 | 68-077 (missing) -- $436,000 STUDY CONTRACT AWARDED MCDONNELL DOUGLAS |
| Oct. 28, 1968 | 68-078 -- STEP THAT WILL LEAD TO FINAL DECISION ON NEXT APOLLO OUTLINED BY ADMINISTRATION |
| Oct. 28, 1968 | ITINERARY OF SPIRO AGNEW'S VISIT TO MANNED SPACECRAFT CENTER |
| Oct. 31, 1968 | NASA HQ: RUBY LUNAR SCIENCE INSTITUTE HEAD |
| Nov. 12, 1968 | NASA HQ: APOLLO 8 MISSION ORBITAL FLIGHT AROUND MOON ANNOUNCED |
| Nov. 15, 1968 | 68-079 -- PLANS CALL FOR U.S. ASTRONAUTS TO PLACE THREE SCIENTIFIC EXPERIMENTS ON LUNAR SURFACE |
| Nov. 15, 1968 | 68-080 -- COMPLETION OF MANNED VACUUM TESTING |
| Nov. 13, 1968 | 68-081 -- PRIME CREWMEN FOR APOLLO 10 |
| Nov. 15, 1968 | 68-000 -- ANNUAL AWARDS CEREMONY |
| Nov. 15, 1968 | 68-082 -- NASA AWARDS CONTRACT TO LINK GROUP, GENERAL PRECISION FOR MAINTENANCE & MODIFICATION OF MSC'S SIMULATOR COMPLEX |
| Dec. 3, 1968 | 68-083 -- NASA AWARDS $3,500,000 CONTRACT TO ALLIS CHALMERS |
| Dec. 4, 1968 | 68-084 -- NASA SIGNS SUPPLEMENTAL AGREEMENT WITH GRUMMAN |
| Dec. 10, 1968 | 68-085 -- NASA AWARDS 1-YEAR CONTRACT EXTENSION TO LOCKHEED |
| Dec. 17, 1968 | 68-086 -- NASA AWARDS 2-YEAR CONTRACT TO TRW |
| Dec. 19, 1968 | 68-087 -- WILLIAM SCHNEIDER NAMED AAP DIRECTOR |
| Dec. 31, 1968 | 68-088 -- AWARD OF NORTH AMERICAN CONTRACT |